Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Silver Line Way

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 0:58 Mins
at . 1:00 behind Load 41%? Chelsea Only

2: 10 - 14 Mins
at . 1:58 behind Vehicle 1305 Load 100%? Chelsea
past South Station on route SLW-Silver Line Way - South Station Only

3: 22 - 27 Mins
at . 0:33 behind Vehicle 1309 Load 81%? Chelsea
aprchg World Trade Center Sta on Congress St Only

4: 30 - 53 Mins
at . 0:41 behind Vehicle 1318 Load 178%? Chelsea
at Chelsea Only

5: 33 - 43 Mins
at . 1:00 behind Vehicle 1319 Load -75%? Chelsea
past Eastern Avenue Only

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.