Current time: Refresh

Agencies » Seattle King County Metro

Remove ads by becoming a Premium User

 • : E-Line Rapid Ride at N 200th St on Aurora Ave N

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: At Stop 7:43 behind Vehicle 6211 Load 182%? In long layover, last seen 12:18

2: 4 Mins
at . 8:11 behind Vehicle 8210 Load 121%? Aurora Village Transit Center

3: 4 - 7 Mins
at . 27:11 behind Vehicle 6094 Load 192%? Aurora Village Transit Center

4: 11 Mins
at . 4:16 ahead of Vehicle 8253 Load 131%? Aurora Village Transit Center

5: 12 - 18 Mins
at . 19:18 behind Vehicle 8125 Load 41%? Aurora Village Transit Center

RapidRide E Line to Seattle will be rerouted and will not serve Stop #510 on S Washington St at 3rd Ave S from Monday, September 23 through Friday, September 27, at all times, due to construction. Started Mon Sep 23 Until Sat Sep 28
More...

Vehicle 8113 aprchg 3rd Ave S on S Washington St heading South

Vehicle 6211 at N 200th St on Aurora Ave N heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.