Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 14 Mins
at . 27:38 behind Vehicle 2145.3568.3069.8755 Load 295%? Platform 2 Leppington

2: 28 - 33 Mins
at . 1:01 behind Vehicle 8460.6450.7335.3596 Load 51%? Platform 2 Leppington Last seen 1:21

3: 32 Mins
at . 3:14 behind Vehicle 4962 Load 7%? Platform 2 Leppington In long layover, last seen 41:34

4: 59 - 1h03 Mins
at . 1:30 behind Vehicle 7813.6533.5656.2457 Load 94%? Platform 2 Leppington Last seen 11:32

5: 1h01 Mins
at . 2:43 behind Vehicle 4733 Load 4%? Platform 2 Leppington In long layover, last seen 12:05

Running late Started Sun Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Fri Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Vehicle 8050 aprchg Leppington Station heading West

Vehicle 4962 aprchg Schofields Station heading North

Vehicle 4733 aprchg Schofields Station heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.