Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 350-North Burlington - Alewife Station at 449 Mystic St - Winchester Line

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 - 7 Mins
at . 3:28 behind Vehicle 3133 Load 89%? Many Seats Available North Burlington via Mall Rd
past Franklin St on Massachusetts Ave Only

2: 24 - 32 Mins
at . 5:49 behind Vehicle 2001 Load 112%? North Burlington via Mall Rd
past Lafayette St on Massachusetts Ave Only

3: 44 - 52 Mins
at . 5:11 behind Vehicle 1959 Load 97%? North Burlington via Mall Rd
aprchg Revere Rd on Cambridge Rd Only

4: 1h29 - 1h38 Mins
at . (Sched. based) 5:10 behind Vehicle 2025 North Burlington via Mall Rd
past Cambridge St on Chestnut Ave Only

 • : 350-North Burlington - Alewife Station at Day Circle on 205 Cambridge Rd

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:16 - 2 Mins
at . 6:52 behind Vehicle 1959 Load 116%? Many Seats Available Alewife via Mall Rd
aprchg Revere Rd on Cambridge Rd Only

2: 20 - 23 Mins
at . 0:46 behind Vehicle 2074 Load 84%? Many Seats Available Alewife via Mall Rd
aprchg Bedford St on Cambridge St Only

3: 33 - 35 Mins
at . 5:08 ahead of Vehicle 2025 Load 70%? Many Seats Available Alewife via Mall Rd
past Cambridge St on Chestnut Ave Only

4: 56 - 1h07 Mins
at . 1:47 behind Vehicle 3145 Load 135%? Alewife via Mall Rd
aprchg Bedford Rd on Cambridge Rd Only

5: 1h17 - 1h28 Mins
at . 2:45 behind Vehicle 3133 Load 105%? Alewife via Mall Rd
past Franklin St on Massachusetts Ave Only

The Alewife Garage may have additional spaces taken to accelerate repairs while the demand for parking is low. Once parking demand increases, these spaces will be made available again to our riders. Started Mar 27 2020
Due to garage construction, the Alewife West Pedal & Park is closed until further notice. Please use the Central or East Pedal & Parks instead. Contact pedalpark@mbta.com with questions Started May 30 2023
The Alewife front entrance at Cambridge Park Dr. will be closed from 8:00 AM to 4:00 PM, Monday – Friday, until further notice due to construction. All buses will use the back entrance at Alewife station via Access Rd. Starts Mar 27 2025 Until Mar 27 2025
More...

Merge predictions Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.