Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 350-North Burlington - Alewife Station at 449 Mystic St - Winchester Line

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 5 Mins
at . 9:59 behind Vehicle 2022 Load 99%? Many Seats Available North Burlington via Mall Rd
past Medford St on Massachusetts Ave Only

2: 26 - 35 Mins
at . 6:20 behind Vehicle 2001 Load 125%? North Burlington via Mall Rd
aprchg Broadway on Massachusetts Ave Only

3: 1h04 - 1h14 Mins
at . 12:16 behind Vehicle 1943 Load 181%? North Burlington via Mall Rd
past 2-4 Fourth Ave Only

4: 1h24 - 1h32 Mins
at . (Sched. based) 7:08 behind Vehicle 1991 North Burlington
aprchg Cambridge St on Chestnut Ave Only

 • : SL1-Logan Airport Terminals - South Station at Courthouse

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 4 - 9 Mins
at . 4:06 behind Vehicle 1335 Load 109%? South Station
aprchg World Trade Center Sta on Congress St Only

2: 10 Mins
at . 0:21 ahead of Vehicle 1299 Load 107%? South Station Last seen 1:11
aprchg South Station on route SLW-Silver Line Way - South Station Only

3: 12 - 15 Mins
at . 0:51 behind Vehicle 1331 Load 45%? Many Seats Available South Station
past Terminal E - Arrivals Level Only

4: 18 - 21 Mins
at . 1:29 ahead of Vehicle 1332 Load 80%? Many Seats Available South Station
aprchg Terminal C - Arrivals Level Only

5: 18 - 31 Mins
at . 0:29 behind Vehicle 1299 Load 89%? South Station Last seen 1:11
aprchg South Station on route SLW-Silver Line Way - South Station Only

The Alewife Garage may have additional spaces taken to accelerate repairs while the demand for parking is low. Once parking demand increases, these spaces will be made available again to our riders. Started Mar 27 2020
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Due to garage construction, the Alewife West Pedal & Park is closed until further notice. Please use the Central or East Pedal & Parks instead. Contact pedalpark@mbta.com with questions Started May 30 2023
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...
The Alewife front entrance at Cambridge Park Dr. will be closed from 8:00 AM to 4:00 PM, Monday – Friday, until further notice due to construction. All buses will use the back entrance at Alewife station via Access Rd. Starts Mar 27 2025 Until Mar 27 2025
More...

Merge predictions Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.