Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 350-North Burlington - Alewife Station at 449 Mystic St - Winchester Line

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 - 8 Mins
at . 10:19 behind Vehicle 2074 Load 126%? Few Seats Available North Burlington via Mall Rd
past Foster St on Massachusetts Ave Only

2: 17 - 23 Mins
at . 3:06 behind Vehicle 2025 Load 28%? Many Seats Available North Burlington via Mall Rd Last seen 1:28
at Alewife Only

3: 37 - 45 Mins
at . 4:03 behind Vehicle 3145 Load 70%? North Burlington via Mall Rd
past Russell St on Mystic St Only

4: 57 - 1h05 Mins
at . 4:21 behind Vehicle 3133 Load 68%? North Burlington via Mall Rd
past 31 Burlington Mall Rd Only

5: 1h17 - 1h26 Mins
at . (Sched. based) 5:49 behind Vehicle 2001 North Burlington via Mall Rd
past Bedford St on Cambridge St Only

 • : SL3-Chelsea Station - South Station at Airport

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 1:59 - 3 Mins
at . 1:07 behind Vehicle 1312 Load 159%? Many Seats Available Chelsea Last seen 1:59
past Silver Line Way Only

2: 12 - 16 Mins
at . 0:04 behind Vehicle 1301 Load 67%? Few Seats Available Chelsea
at South Station Only

3: 16 - 19 Mins
at . 0:43 ahead of Vehicle 1314 Load 44%? Chelsea
aprchg South Station Only

4: 28 - 33 Mins
at . 0:32 ahead of Vehicle 1305 Load 132%? Chelsea
past World Trade Center Only

5: 39 - 45 Mins
at . 0:10 behind Vehicle 1318 Load 107%? Chelsea
at Airport Only

The Alewife Garage may have additional spaces taken to accelerate repairs while the demand for parking is low. Once parking demand increases, these spaces will be made available again to our riders. Started Mar 27 2020
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Due to garage construction, the Alewife West Pedal & Park is closed until further notice. Please use the Central or East Pedal & Parks instead. Contact pedalpark@mbta.com with questions Started May 30 2023
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...
The Alewife front entrance at Cambridge Park Dr. will be closed from 8:00 AM to 4:00 PM, Monday – Friday, until further notice due to construction. All buses will use the back entrance at Alewife station via Access Rd. Starts Mar 27 2025 Until Mar 27 2025
More...

Merge predictions Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.