Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL1-Logan Airport Terminals - South Station at Courthouse

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 7 Mins
at . 0:54 behind Vehicle 1319 Load 78%? Many Seats Available South Station
near W 5th St on B St on route SLW-Silver Line Way - South Station Only

2: 9 - 13 Mins
at . 0:26 behind Vehicle 1334 Load 85%? Many Seats Available South Station
past Terminal E - Arrivals Level Only

3: 15 - 20 Mins
at . 2:42 ahead of Vehicle 1335 Load 70%? South Station
at Terminal B Stop 1 - Arrivals Level Only

4: 25 - 32 Mins
at . 3:47 ahead of Vehicle 1331 Load 85%? South Station
past World Trade Center Only

5: 40 - 48 Mins
at . 0:01 ahead of Vehicle 1343 Load 135%? South Station
at South Station Only

 • : 424-Eastern Avenue & Essex Street - Wonderland Station at Granite St on Western Ave going Wonderland

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...
The following stop is closed beginning Sun Apr 7: Eastern Ave @ Victory Rd due to accessibility concerns. Please use Eastern Ave @ Glenwood St instead. Starts Apr 7
Affected routes:
424
456

Merge predictions Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.