Current time: Refresh

Agencies » Boston MBTA

Route 78 detoured between Tuesday Mar 19 and Friday Mar 29, from 7 AM to 3 PM, due to construction at Concord Ave opp Fern St. The nearest connections are Concord Ave opp New St and Concord Ave @ Alpine St. Starts Mar 29 Until Mar 29
Affected stops:
Concord Ave opp Fern St (inbound)

Remove ads by becoming a Premium User

 • : 505-Waltham Center - Federal Street & Franklin Street at Orris St on Lexington St

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 5 - 7 Mins
at . 2:49 behind Vehicle 3254 Load 116%? Many Seats Available Downtown (Express)
at Crescent St on Maple St Only

2: 25 - 30 Mins
at . 0:33 behind Vehicle 1745 Load 91%? Downtown (Express)
past Main St on Elm St Only

3: 52 - 58 Mins
at . 7:50 behind Vehicle 1832 Load 105%? Downtown (Express)
at G St on E Broadway on route 10-City Point - Copley Square Only

4: 1h04 - 1h08 Mins
at . 1:31 behind Vehicle 3264 Load 43%? Downtown (Express)
aprchg Chinatown Gate Only

5: 1h24 - 1h31 Mins
at . (Sched. based) 1:03 behind Vehicle 3290 Downtown (Express)
past Prospect St on Washington St Only

 • : 78-Arlmont Village - Harvard Station at Lamoine St on East Service Rd

| Show Only | Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 11 - 16 Mins
at . 3:34 behind Vehicle 2089 Load 119%? Harvard
past Appleton St on Wadsworth Rd Only

2: 32 - 37 Mins
at . 0:27 behind Vehicle 1955 Load 82%? Harvard
aprchg Walden St on Concord Ave Only

3: 1h01 - 1h03 Mins
at . 2:40 ahead of Vehicle 3151 Load 101%? Harvard
past New St on Concord Ave Only

Merge predictions Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.