Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 206-Hollywood - Athens Via Normandie Av at 8th on Irolo going Vermont on Fountain

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 - 8 Mins
at . 4:54 behind Vehicle 4177 Load 119%?

2: 13 - 18 Mins
at . 0:24 ahead of Vehicle 1881 Load 71%?

3: 35 - 42 Mins
at . 7:01 behind Vehicle 5918 Load 114%?

4: 43 - 49 Mins
at . 0:10 ahead of Vehicle 4130 Load 58%?

5: 1h00 - 1h15 Mins
at . 6:34 behind Vehicle 3860 Load 142%?

The following stop is closed until Fri May 3 at 4:00 PM due to construction: Vermont / 119th (Southbound) Started Apr 2 Until May 3 (Updated Apr 2 )
Affected routes:
204
206

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.