Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 251-Eagle Rock-Long Bch C-Sta Via Eagle Rock-Soto St at Olive on State going Eagledale on Colorado

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:24 - 1:36 Mins
at . 0:34 behind Vehicle 8619 Load 159%?

2: 16 - 21 Mins
at . 0:27 behind Vehicle 8537 Load 135%? Last seen 1:27

3: 37 - 46 Mins
at . Waiting 15:23. 2:11 behind Vehicle 8601 Load 105%?

4: 55 - 1h01 Mins
at . 0:27 behind Vehicle 8563 Load 144%?

5: 1h12 - 1h19 Mins
at . 0:01 ahead of Vehicle 8576 Load 146%?

Planned schedule change on Line 251 effective Monday, August 15 due to early school dismissal. Started Aug 18 2022 (Updated Dec 11 )
More...
LINE 251 detoured until Mon Apr 22 at 4:30 PM due to construction. The following stops are affected: Soto St. between Pico Blvd. and Washington Blvd. Started Apr 9 Until Apr 22 (Updated Apr 16 )
More...
The following stop is closed until Mon Apr 22 each day from 7:00 AM to 4:00 PM due to construction: Colorado / Campus (Westbound) Started Until Apr 22 (Updated )
Affected routes:
251

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.