Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 51-Westlake/Mcarthur Pk Sta-Dtwn Lcsu Dh Via Avalon at going Tamcliff on Victoria

Prev Stop | Next Stop | Schedule | Set Destination

1: 6 Mins
at . 0:42 behind Vehicle 4056 Load 88%?

2: 8 Mins
at . Waiting 8:20. 8:45 ahead of Vehicle 4164 Load 58%?

3: 10 Mins
at . 0:27 ahead of Vehicle 5947 Load 59%?

4: 13 Mins
at . Waiting 6:19. 13:32 ahead of Vehicle 5935 Load 237%?

5: 21 Mins
at . 0:00 behind Vehicle 5876 Load 131%?

LINE 51 detoured until Mon Jun 10 at 4:00 PM due to construction. The following stops are affected: 7th St. between Spring St. and Broadway Started Apr 9 Until Jun 10 (Updated Apr 9 )
Northbound: Regular route 7th St. and Los Angeles St., then continue via 7th St., to R-Main St., L-5th St., L-Broadway, R-7th St., and regular route.

Southbound: Regular route. 7th St. and Hill St., then continue via 7th St., to R-Broadway, L-9th St., L-Main St., R-7th St., and regular route.
LINES 35/38 and 51 detoured until Mon Jun 10 at 4:00 PM due to construction. Started Apr 11 Until Jun 10 (Updated Apr 11 )
More...
The following stop is closed until Sat Apr 20 at 7:00 AM due to filming: 7th / Lucas (Northbound) Started Until Apr 20 (Updated )
Affected routes:
51

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.