Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 51-Westlake/Mcarthur Pk Sta-Dtwn Lcsu Dh Via Avalon at 14th on San Pedro going Tamcliff on Victoria

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:49 - 2 Mins
at . 43:27 ahead of Vehicle 5950 Load 28%?

2: 7 Mins
at . 1:44 behind Vehicle 5954 Load 69%?

3: 10 Mins
at . 2:26 ahead of Vehicle 6096 Load 46%?

4: 17 Mins
at . 12:55 ahead of Vehicle 4028 Load 31%?

5: 17 - 19 Mins
at . Waiting 5:28. 1:51 ahead of Vehicle 4030 Load 35%?

LINE 51 detoured until Mon Jun 10 at 4:00 PM due to construction. The following stops are affected: 7th St. between Spring St. and Broadway Started Apr 9 Until Jun 10 (Updated Apr 9 )
Northbound: Regular route 7th St. and Los Angeles St., then continue via 7th St., to R-Main St., L-5th St., L-Broadway, R-7th St., and regular route.

Southbound: Regular route. 7th St. and Hill St., then continue via 7th St., to R-Broadway, L-9th St., L-Main St., R-7th St., and regular route.
LINES 35/38 and 51 detoured until Mon Jun 10 at 4:00 PM due to construction. Started Apr 11 Until Jun 10 (Updated Apr 11 )
More...
The following stop is closed until Sat Apr 20 at 7:00 AM due to filming: 7th / Lucas (Northbound) Started Apr 18 Until Apr 20 (Updated )
Affected routes:
51

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.