Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 39-Forest Hills Station - Back Bay Station at Spalding St on South St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 21 Mins
at . 0:42 ahead of Vehicle 1265 Load 282%? Back Bay

2: 34 Mins
at . 0:03 behind Vehicle 1206 Load 131%? Back Bay

3: 46 - 47 Mins
at . 1:07 ahead of Vehicle 1270 Load 113%? Back Bay

4: 1h01 Mins
at . 0:09 behind Vehicle 1211 Load 136%? Back Bay

5: 1h13 Mins
at . (Sched. based) 0:00 behind Vehicle 1312 Back Bay

The door to enter the Forest Hills Pedal and Park is not functioning. We are working to have it addressed as quickly as possible, Started Aug 30 2022
Route 39 experiencing delays of up to 20 minutes due to traffic Started Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.