Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 47-Central Square, Cambridge - Broadway Station at Putnam Ave on Pearl St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:04 Mins
at . 15:02 behind Vehicle 1803 Load 108%? Many Seats Available Broadway

2: 5 Mins
at . 0:21 behind Vehicle 1867 Load 27%? Many Seats Available Broadway

3: 25 Mins
at . 0:49 behind Vehicle 1776 Load 102%? Broadway

4: 46 Mins
at . 1:31 behind Vehicle 1866 Load 103%? Broadway

5: 1h05 Mins
at . (Sched. based) 0:00 behind Vehicle 1750 Broadway

Route 47 experiencing delays of up to 20 minutes due to traffic Started Until
The following stop will be permanently closed beginning Sunday Apr 7th: Park Dr @ Mountfort St. Riders may continue to board at Park Dr @ Beacons St. Starts Apr 7
Affected routes:
CT2
47
The following stop is closed beginning Sat Apr 27 due to construction: Mass Ave @ Pearl St. Riders may board at Green St @ Magazine St for inbound service to Broadway. Starts Apr 27
The following stop is closed beginning Sat Apr 27 due to construction: Pearl St @ Franklin St. Riders may board at Green St @ Magazine St or Pearl St @ William St. Starts Apr 27
Affected routes:
47

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.