Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 47-Central Square, Cambridge - Broadway Station at

Prev Stop | Next Stop | Schedule | Set Destination

1: 15 Mins
at . (Sched. based) 9:53 behind Vehicle 1841 Few Seats Available Occupancy: 40% Broadway
past Fenway Sta on Park Dr Only

2: 20 Mins
at . Waiting 6:02. 6:36 behind Vehicle 1898 Many Seats Available Central Square Last seen 1:02
past Broadway Station - Red Line Only

3: 25 Mins
at . (Sched. based) Waiting 7:52. 0:00 behind Vehicle 1781 Many Seats Available Occupancy: 0% Broadway
aprchg Pearl St on Massachusetts Ave Only

4: 41 Mins
at . 8:04 behind Load 107%? Central Square Only

5: 45 Mins
at . (Sched. based) 0:00 behind Vehicle 1884 Broadway
at Longwood Ave on Brookline Ave Only

Route 47 experiencing delays of up to 20 minutes due to traffic Started Until
The following stop will be permanently closed beginning Sunday Apr 7th: Park Dr @ Mountfort St. Riders may continue to board at Park Dr @ Beacons St. Starts Apr 7
Affected routes:
CT2
47
The following stop is closed beginning Sat Apr 27 due to construction: Mass Ave @ Pearl St. Riders may board at Green St @ Magazine St for inbound service to Broadway. Starts Apr 27
The following stop is closed beginning Sat Apr 27 due to construction: Pearl St @ Franklin St. Riders may board at Green St @ Magazine St or Pearl St @ William St. Starts Apr 27
Affected routes:
47

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.