Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : 69-Harvard Square - Lechmere Station at Cambridge St on Felton St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 10 Mins
at . 1:33 behind Vehicle 3137 Load 131%? Harvard

2: 11 Mins
at . 21:46 behind Vehicle 3152 Load 6%? Harvard

3: 32 Mins
at . 4:34 behind Vehicle 2020 Load 109%? Harvard

4: 50 Mins
at . 4:03 behind Vehicle 3152 Load 97%? Harvard

5: 1h08 - 1h11 Mins
at . 2:56 ahead of Vehicle 2020 Load 95%? Harvard

Route 69 experiencing delays of up to 20 minutes due to traffic Started Until
Cambridge St @ Lambert St stop is permanently moving beginning Monday Apr 8. The new stop is located approximately 60' to the west, after the crosswalk and before the railroad crossing. Started Apr 8
Affected routes:
69

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.