Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL1-Logan Airport Terminals - South Station at Terminal A

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 Mins
at . 0:00 behind Vehicle 1343 Load 125%? South Station

2: 13 Mins
at . 0:00 behind Vehicle 1342 Load 104%? South Station

3: 21 Mins
at . 0:00 behind Vehicle 1332 Load 92%? South Station

4: 30 Mins
at . 0:00 behind Vehicle 1340 Load 104%? South Station

5: 37 Mins
at . 0:00 behind Vehicle 1334 Load 81%? South Station

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL 3 detoured Fri, April 19 from 10 PM through the end of service due to construction. Inbound service will be diverted to the Sumner Tunnel due to construction at the I-90 Exit 135. Starts Until Apr 20

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.