Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL1-Logan Airport Terminals - South Station at Terminal B Stop 2 - Arrivals Level

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:14 Mins
at . 1:44 ahead of Vehicle 1342 Load 60%? Many Seats Available South Station

2: 10 Mins
at . 0:19 ahead of Vehicle 1332 Load 122%? South Station

3: 19 Mins
at . 0:43 ahead of Vehicle 1340 Load 111%? South Station

4: 28 Mins
at . 0:24 ahead of Vehicle 1334 Load 120%? South Station

5: 36 Mins
at . 0:42 ahead of Vehicle 1341 Load 99%? South Station

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL 3 detoured Fri, April 19 from 10 PM through the end of service due to construction. Inbound service will be diverted to the Sumner Tunnel due to construction at the I-90 Exit 135. Starts Until Apr 20

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.