Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL1-Logan Airport Terminals - South Station at World Trade Center

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 2 Mins
at . 1:34 ahead of Vehicle 1333 Load 90%? Many Seats Available Logan Airport Last seen 4:38

2: 15 Mins
at . 1:33 ahead of Vehicle 1342 Load 100%? Few Seats Available Logan Airport Last seen 3:41

3: 31 Mins
at . 1:00 behind Vehicle 1341 Load 120%? Logan Airport

4: 41 - 43 Mins
at . 2:11 ahead of Vehicle 1339 Load 76%? Logan Airport

5: 54 - 56 Mins
at . 1:45 ahead of Vehicle 1333 Load 103%? Logan Airport Last seen 4:38

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL 3 detoured Fri, April 19 from 10 PM through the end of service due to construction. Inbound service will be diverted to the Sumner Tunnel due to construction at the I-90 Exit 135. Started Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.