Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL1-Logan Airport Terminals - South Station at World Trade Center

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 Mins
at . 1:33 behind Vehicle 1344 Load 130%? Many Seats Available South Station

2: 13 Mins
at . 0:06 ahead of Vehicle 1340 Load 82%? Few Seats Available South Station

3: 21 Mins
at . 0:10 ahead of Vehicle 1334 Load 99%? South Station

4: 22 - 23 Mins
at . 1:06 ahead of Vehicle 1297 Load 1%? South Station

5: 33 Mins
at . 2:39 behind Vehicle 1311 Load 131%? South Station

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL 3 detoured Fri, April 19 from 10 PM through the end of service due to construction. Inbound service will be diverted to the Sumner Tunnel due to construction at the I-90 Exit 135. Starts Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.