Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL1-Logan Airport Terminals - South Station at Courthouse

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 Mins
at . 0:05 ahead of Vehicle 1340 Load 133%? South Station

2: 9 Mins
at . 2:23 ahead of Vehicle 1322 Load 15%? South Station

3: 21 Mins
at . 3:23 behind Vehicle 1343 Load 107%? South Station

4: 28 Mins
at . 0:08 ahead of Load 59%? South Station

5: 31 Mins
at . 3:13 behind Vehicle 1334 Load 30%? South Station

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.