Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL2-Drydock Avenue - South Station at 23 Drydock Ave

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 - 12 Mins
at . 1:31 behind Vehicle 1331 Load 182%? South Station
aprchg South Station Only

2: 14 - 20 Mins
at . 1:12 behind Vehicle 1311 Load 98%? South Station
aprchg World Trade Center Only

3: 23 - 28 Mins
at . 6:00 ahead of Vehicle 1312 Load 100%? South Station
aprchg Design Center Place on Drydock Ave Only

4: 23 - 29 Mins
at . 0:51 behind Vehicle 1307 Load -2%? South Station
aprchg Tide St on Northern Ave Only

5: 32 - 35 Mins
at . 6:09 ahead of Vehicle 1331 Load 102%? South Station
aprchg South Station Only

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:00 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.