Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL2-Drydock Avenue - South Station at

Prev Stop | Next Stop | Schedule | Set Destination

1: 6 Mins
at . 1:00 ahead of Vehicle 1320 South Station
aprchg Harbor St on Northern Ave Only

2: 20 Mins
at . 1:00 ahead of Vehicle 1302 Load 117%? South Station Last seen 1:18
at South Station Only

3: 33 Mins
at . 0:18 ahead of Vehicle 1319 Load 106%? South Station
aprchg Design Center Place on Drydock Ave Only

4: 44 Mins
at . 1:00 ahead of Vehicle 1320 Load 94%? South Station
aprchg Harbor St on Northern Ave Only

5: 58 Mins
at . 1:00 ahead of Vehicle 1302 Load 117%? South Station Last seen 1:18
at South Station Only

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.