Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL2-Drydock Avenue - South Station at

Prev Stop | Next Stop | Schedule | Set Destination

1: 30 - 34 Mins
at . 3:23 ahead of Vehicle 1307 South Station

2: 40 - 44 Mins
at . 3:59 ahead of Vehicle 1318 Load 78%? South Station Last seen 1:43

3: 56 Mins
at . 5:13 ahead of Load 140%? South Station

4: 1h11 Mins
at . (Sched. based) 0:00 behind Vehicle 1307 South Station

5: 1h20 Mins
at . (Sched. based) 0:00 behind Vehicle 1318 South Station Last seen 1:43

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.