Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL2-Drydock Avenue - South Station at going South Station

Prev Stop | Next Stop | Schedule | Set Destination

1: 6 Mins
at . 0:45 ahead of Vehicle 1320 Load 34%? Many Seats Available
aprchg Black Falcon Ave on Drydock Ave Only

2: 14 Mins
at . 0:25 ahead of Vehicle 1319 Load 110%? Last seen 1:25
at South Station Only

3: 22 Mins
at . 0:46 ahead of Vehicle 1302 Load 101%?
aprchg World Trade Center Only

4: 29 Mins
at . 0:33 ahead of Vehicle 1306 Load 95%?
at Design Center Place on Drydock Ave Only

5: 37 Mins
at . 0:47 ahead of Vehicle 1320 Load 102%?
aprchg Black Falcon Ave on Drydock Ave Only

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.