Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL2-Drydock Avenue - South Station at World Trade Center

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 0:03 Mins
at . 1:23 behind Vehicle 1307 Drydock
aprchg World Trade Center Only

2: 12 - 21 Mins
at . 1:12 ahead of Vehicle 1331 Load 85%? Drydock
aprchg Silver Line Way on route SLW-Silver Line Way - South Station Only

3: 30 - 35 Mins
at . 1:09 behind Vehicle 1307 Load 114%? Drydock
aprchg World Trade Center Only

4: 42 - 55 Mins
at . 0:06 ahead of Vehicle 1331 Load 75%? Drydock
aprchg Silver Line Way on route SLW-Silver Line Way - South Station Only

5: 54 Mins
at . 0:23 behind Load 44%? Drydock Only

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.