Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Airport

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 2 Mins
at . 5:04 ahead of Vehicle 1309 Load 49%? Many Seats Available Chelsea

2: 20 Mins
at . 3:50 ahead of Vehicle 1301 Load 138%? Many Seats Available Chelsea

3: 33 - 35 Mins
at . 2:20 ahead of Vehicle 1315 Load 108%? Chelsea

4: 50 - 52 Mins
at . 2:33 ahead of Vehicle 1308 Load 134%? Chelsea

5: 1h07 - 1h09 Mins
at . 2:18 ahead of Vehicle 1307 Load 138%? Chelsea

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL 3 detoured Fri, April 19 from 10 PM through the end of service due to construction. Inbound service will be diverted to the Sumner Tunnel due to construction at the I-90 Exit 135. Starts Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.