Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Silver Line Way

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination | Add Route ▾

1: 5 - 7 Mins
at . 8:24 ahead of Vehicle 1319 Few Seats Available South Station
past Airport Only

2: 9 - 13 Mins
at . 12:19 ahead of Vehicle 1306 Load 46%? Many Seats Available South Station
aprchg Airport Only

3: 12 Mins
at . 0:00 behind Vehicle 1318 Load 13%? South Station
near 240 Southampton St on route SLW-Silver Line Way - South Station Only

4: 15 Mins
at . 0:00 behind Load 30%? South Station Only

5: 16 Mins
at . 0:00 behind Load 10%? South Station Only

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.