Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Bellingham Square

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 Mins
at . 2:29 behind Vehicle 1315 Load 120%? Many Seats Available Chelsea

2: 14 Mins
at . 15:10 ahead of Vehicle 1311 Load 63%? Many Seats Available Chelsea

3: 16 Mins
at . 1:31 ahead of Vehicle 1328 Load 12%? Many Seats Available Chelsea

4: 44 Mins
at . 3:10 behind Vehicle 1320 Load 215%? Chelsea

5: 53 - 55 Mins
at . 2:22 ahead of Vehicle 1309 Load 63%? Chelsea

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL 3 detoured Fri, April 19 from 10 PM through the end of service due to construction. Inbound service will be diverted to the Sumner Tunnel due to construction at the I-90 Exit 135. Starts Apr 19 Until Apr 20

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.