Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : E-Green Line E at Copley

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 Mins
at . 3:39 behind Vehicle 3875-3675 Load 196%? Medford/Tufts

2: 6 Mins
at . (Sched. based) 4:41 behind Vehicle G-10125 Load 58%? Medford/Tufts

3: 11 Mins
at . 2:38 behind Vehicle 3833-3600 Load 114%? Medford/Tufts

4: 13 Mins
at . 2:48 ahead of Vehicle 3868-3715 Load 49%? Medford/Tufts

5: 14 Mins
at . (Sched. based) 6:00 behind Vehicle G-10062 Load 195%? Medford/Tufts

Green Line: Trains will bypass Magoun Square on the E Branch, from start to end of service on May 4, for improvement work on an accessibility ramp at the Station. Riders can use Bus Routes 80 and 88, which operate between the Magoun Sq area and Lechmere. Starts May 4 Until May 5
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.