Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : E-Green Line E at Fenwood Road

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 Mins
at . 4:01 behind Vehicle 3671-3885 Load 190%? Medford/Tufts

2: 11 Mins
at . 0:36 behind Vehicle 3833-3600 Load 62%? Medford/Tufts

3: 15 - 18 Mins
at . 2:57 ahead of Vehicle 3839-3646 Load 59%? Medford/Tufts

4: 23 - 25 Mins
at . 1:31 ahead of Vehicle 3863-3681 Load 145%? Medford/Tufts

5: 25 Mins
at . (Sched. based) 0:00 behind Vehicle G-10163 Medford/Tufts

Green Line: Trains will bypass Magoun Square on the E Branch, from start to end of service on May 4, for improvement work on an accessibility ramp at the Station. Riders can use Bus Routes 80 and 88, which operate between the Magoun Sq area and Lechmere. Starts May 4 Until May 5
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.