Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : E-Green Line E at Back of the Hill

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 Mins
at . Added Vehicle 3811-3606-3602 Load 278%?

2: 18 - 22 Mins
at . 4:24 ahead of Vehicle 3862-3682 Load 288%? Medford/Tufts

3: 22 Mins
at . (Sched. based) 0:00 behind Vehicle G-10374 Medford/Tufts

4: 28 - 36 Mins
at . 7:55 ahead of Vehicle 3718-3836 Load 262%? Medford/Tufts Last seen 1:02

5: 36 Mins
at . (Sched. based) 0:00 behind Vehicle G-10353 Medford/Tufts

Green Line: Trains will bypass Magoun Square on the E Branch, from start to end of service on May 4, for improvement work on an accessibility ramp at the Station. Riders can use Bus Routes 80 and 88, which operate between the Magoun Sq area and Lechmere. Starts May 4 Until May 5
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.