Current time: Refresh

Agencies » Mississauga MiWay

Remove ads by becoming a Premium User

 • : 61-Mavis at West Elora Dr on Rathburn Rd going

1: 2 Mins
at . Waiting 8:04. Vehicle 2280 Load 110%?
at City Centre Transit Terminal Platform E
2: 12 Mins
at . Waiting 8:04. 10:01 behind Vehicle 2280 Load 50%?
at City Centre Transit Terminal Platform E
3: 22 Mins
at . 0:00 behind Vehicle 1903 Load 50%?
aprchg Father Dsouza Dr on Mavis Rd
4: 22 Mins
at . Vehicle 1903 Load 86%?
aprchg Father Dsouza Dr on Mavis Rd
61 Mavis Started Wed Oct 30 2024 Until Wed Dec 31
61 North - Stop 6110 on Mavis Rd at Rodeo Dr is relocated 90 metres north for construction.
103 Hurontario Express Started Mon Jan 6 2025 Until Wed Dec 31
103 South - Stop 0723 on Hurontario St at the Queensway is relocated 25 metres south for LRT construction. The shelter will remain accessible for use.

Add stop (different agency)