Current time: Refresh Loading history based predictions ...

Remove ads by becoming a Premium User

 •  61-Mavis at Clementine Dr on Mavis Rd going 61 N Mavis To Sheridan College

1: 2 Mins
at . 2:43 behind Vehicle 2420 Load 117%? Many Seats Load: 40%
aprchg Kaiser Dr on Mavis Rd Only
2: 6 Mins
at . 8:37 ahead of Vehicle 2288 Articulation Artic Load 92%? Many Seats Load: 40%
aprchg Rodeo Dr on Mavis Rd Only
3: 20 Mins
at . 11:24 ahead of Vehicle 2232 Load 86%? Many Seats Load: 20%
at Confederation Pky on Rathburn Rd Only
4: 46 Mins
at . 0:00 behind Vehicle 2152 Articulation Artic Load 180%?
past West Elora Dr on Rathburn Rd Only
5: 59 Mins
at . 0:00 behind Vehicle 2393 Articulation Artic Load 93%?
aprchg Plymouth Dr on Mavis Rd Only

Add stop (different agency)

Leaflet | Map data © OpenStreetMap contributors

61 Mavis Started Fri Aug 28 Until Thu Dec 31
61 North - Stop 1246 on Mavis Rd north of Eglinton Ave is closed for construction. Use the temporary stop 100 metres south.
61 Mavis Started Thu Aug 20 Until Thu Dec 31
61 South - Stop 1138 on Mavis Rd south of Derry Rd is closed for construction. Use the temporary stop 100 metres north.
61 Mavis Started Fri Aug 28 Until Thu Dec 31
61 South - Stop 6115 on Mavis Rd at Matheson Blvd is closed for construction. Use the temporary stop 80 metres south.
61 Mavis Started Fri Aug 28 Until Thu Dec 31
61 South - Stop 6125 on Mavis Rd at Britannia Rd is closed for construction. Use the temporary stop 100 metres south.
61 Mavis Started Fri Sep 4 Until Thu Dec 31
61 North - Stop 6106 on Mavis Rd at Bristol Rd is closed for construction. Use the temporary stop 100 metres north.
61 Mavis Started Fri Sep 4 Until Thu Dec 31
61 North - Stop 6109 on Mavis Rd at Matheson Blvd is closed for construction. Use the temporary stop 100 metres north.