Current time: Refresh

Agencies » Mississauga MiWay

Remove ads by becoming a Premium User

 • : 61-Mavis at Winterton Way on Mavis Rd going 61 N Mavis To Sheridan College

1: 10 - 13 Mins
at . 3:27 behind Vehicle 2287 Load 122%?
at City Centre Transit Terminal Platform E Only
2: 23 - 30 Mins
at . 2:39 behind Vehicle 1793 Artic Load 94%?
aprchg West Elora Dr on Rathburn Rd Only
3: 35 - 41 Mins
at . 1:13 behind Vehicle 2279 Load 90%?
at Plymouth Dr on Mavis Rd Only
4: 50 - 55 Mins
at . 2:29 behind Vehicle 2395 Load 116%?
aprchg South of Derry Rd on Mavis Rd Only
5: 1h05 - 1h11 Mins
at . 1:36 behind Vehicle 2375 Load 101%?
at Sheridan College Brampton Campus Only
61 Mavis Started Wed Oct 30 2024 Until Wed Dec 31
61 North - Stop 6110 on Mavis Rd at Rodeo Dr is relocated 90 metres north for construction.
103 Hurontario Express Started Mon Jan 6 2025 Until Wed Dec 31
103 South - Stop 0723 on Hurontario St at the Queensway is relocated 25 metres south for LRT construction. The shelter will remain accessible for use.

Add stop (different agency)