• : 61-Mavis at South of Twain Ave on Mavis Rd going →61 S Mavis To City Centre
1:
6 - 10 Mins
at
.
0:03 ahead of
Vehicle 2279 Load
96%? Many Seats Occupancy: 20%aprchg East of Tait Blvd on Steeles Ave
Only 2:
16 - 22 Mins
at
.
0:22 behind Vehicle 2395 Load
98%? ↩aprchg Sheridan College Brampton Campus
Only 3:
28 - 29 Mins
at
.
3:00 ahead of
Vehicle 2433 Load
68%? ↩past Cranberry Cres Walkway on Steeles Ave
Only 4:
40 - 45 Mins
at
.
0:19 behind Vehicle 2375 Load
113%? ↩past Cantay Rd on Mavis Rd
Only 5:
52 - 56 Mins
at
.
0:50 ahead of
Vehicle 2277 Load
86%? ↩aprchg North of Eglinton Ave on Mavis Rd
Only 61 Mavis Started Wed Oct 30 2024 Until Wed Dec 31
61 North - Stop 6110 on Mavis Rd at Rodeo Dr is relocated 90 metres north for construction.103 Hurontario Express Started Mon Jan 6 2025 Until Wed Dec 31
103 South - Stop 0723 on Hurontario St at the Queensway is relocated 25 metres south for LRT construction. The shelter will remain accessible for use.Add stop (different agency)