Current time: Refresh

Agencies » Fort Wright TANK

Remove ads by becoming a Premium User

 • : 25-NKU/Alexandria at Renshaw on Alexandria going Cincinnati

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 18 - 24 Mins
at . Waiting 18:20. 4:46 behind Vehicle 2241 Load 117%? Empty

2: 57 - 1h03 Mins
at . 14:23 behind Vehicle 2219 Load 132%?

3: 1h18 - 1h21 Mins
at . 2:37 behind Vehicle 2186 Load 61%?

The NKU/Alexandria I Route(s) will operate Detour as the result of Maintenance starting 4/18/2024. Started Apr 17 Until Apr 17
The NKU/Alexandria O Route(s) will operate Detour as the result of Maintenance starting 4/18/2024. Started Apr 17 Until Apr 17

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.