Current time: Refresh

Agencies » Toronto TTC

Line 2 Bloor-Danforth: No service between Woodbine and Kennedy due to scheduled track work. Shuttle buses are running between Woodbine and Kennedy. Started (Updated )
Regular service will resume by 6 a.m. On Monday, April 22, 2024.
On Saturday, April 27, there will be no subway service on Line 1 Yonge-University between Davisville and York Mills stations due to planned track work. Shuttle buses will operate. Regular service will resume on Sunday, April 28 at 8 a.m. (Updated Apr 19 )
This weekend, there will be no subway service on Line 2 between Woodbine and Kennedy stations due to track work. Shuttle buses will operate. Regular service will resume by 6 a.m. on Monday, April 22, 2024 See other service alerts. (Updated Apr 16 )

Remove ads by becoming a Premium User

 • : 123-Sherway at Gair Dr on Evans Ave

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 Mins
at . 7:24 behind Vehicle 8209 Load 123%? 123C South to Long Branch via Shorncliffe and North Queen

2: 24 Mins
at . 12:07 behind Vehicle 8035 Load 128%? 123B South to Long Branch via Shorncliffe and East Mall

3: 36 Mins
at . 12:16 behind Vehicle 3320 Load 106%? 123C South to Long Branch via Shorncliffe and North Queen

4: 48 Mins
at . 0:08 behind Vehicle 8124 Load 103%? 123C South to Long Branch via Shorncliffe and North Queen

5: 49 Mins
at . 15:04 behind Vehicle 3343 Load 8%? 123B South to Long Branch via Shorncliffe and East Mall

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.