Current time: Refresh

Agencies » Toronto TTC

This Saturday and Sunday, subway service on Line 2 Bloor-Danforth will not stop at Pape Station due to subway tunnel work related to the new Ontario Line. Bus service will not be affected. (Updated Apr 23 )
On Saturday, April 27, there will be no subway service on Line 1 Yonge-University between Davisville and York Mills stations due to planned track work. Shuttle buses will operate. Regular service will resume on Sunday, April 28 at 8 a.m. (Updated Apr 19 )

Remove ads by becoming a Premium User

 • : 129-McCowan North at 2050 McCowan Rd going South to Kennedy Stn via Scarborough Ctr Stn

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 10 - 11 Mins
at . 1:44 ahead of Vehicle 3279 Load 203%?

2: 22 Mins
at . 0:37 behind Vehicle 3316 Load 124%?

3: 32 Mins
at . 0:37 behind Vehicle 8908 Load 100%?

4: 41 Mins
at . (Sched. based) 0:00 behind Vehicle 3268

5: 51 Mins
at . (Sched. based) 0:00 behind Vehicle 3113

Vehicle 3294 on Route 129 aprchg Ridgecrest Rd on Major Mackenzie Dr East heading East

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.