Current time: Refresh

Agencies » Toronto TTC

Line 1 Yonge-University Regular service has resumed southbound at Eglinton. Started Until (Updated )
Line 2 Bloor-Danforth Regular service has resumed between Ossington and St George. Started Until (Updated )
This Saturday and Sunday, subway service on Line 2 Bloor-Danforth will not stop at Pape Station due to subway tunnel work related to the new Ontario Line. Bus service will not be affected. (Updated )
On Saturday, April 27, there will be no subway service on Line 1 Yonge-University between Davisville and York Mills stations due to planned track work. Shuttle buses will operate. Regular service will resume on Sunday, April 28 at 8 a.m. (Updated Apr 19 )

Remove ads by becoming a Premium User

 • : 36-Finch West at Topbank Dr on Humberwood Blvd going 36B West to Humberwood

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 Mins
at . 14:55 ahead of Vehicle 3637 Load 184%?

2: 8 Mins
at . 16:54 ahead of Vehicle 9115 Artic Load 67%?

3: 15 Mins
at . 15:19 ahead of Vehicle 3591 Load 126%?

4: 18 Mins
at . 18:20 ahead of Vehicle 9105 Artic Load 50%?

5: 22 Mins
at . 20:25 ahead of Vehicle 9104 Artic Load 65%?

Vehicle 9127 Artic on Route 36 past Finch West Station heading South

Vehicle 1340 on Route 36 past Yonge St - Finch Station on Finch Ave West heading East

Vehicle 8950 on Route 36 at 1150 Finch Ave West heading West

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.