Current time: Refresh

Agencies » Toronto TTC

This Monday, April 15, to Thursday, April 18, 2024, subway service on Line 2 between St George and Woodbine stations will end early each night at 11 p.m. for planned track work. Shuttle buses will operate. See other service alerts. (Updated Apr 12 )
This weekend, there will be no subway service on Line 2 between Woodbine and Kennedy stations due to track work. Shuttle buses will operate. Regular service will resume by 6 a.m. on Monday, April 22, 2024 See other service alerts. (Updated Apr 16 )

Remove ads by becoming a Premium User

 • : 43-Kennedy at Radnor Ave on Kennedy Rd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 Mins
at . 1:35 behind Vehicle 3150 Load 381%? 43A North to Steeles

2: 7 Mins
at . 0:37 behind Vehicle 8914 Load 37%? 43B North to Scarborough Centre

3: 13 Mins
at . 0:52 ahead of Vehicle 3209 Load 100%? 43A North to Steeles Last seen 1:04

4: 23 Mins
at . 0:52 ahead of Vehicle 9201 Load 182%? 43A North to Steeles

5: 28 Mins
at . 0:52 ahead of Vehicle 3197 Load 91%? 43A North to Steeles Last seen 1:04

Vehicle 3209 on Route 43 past Kennedy Station on Eglinton Ave East heading East

Vehicle 3197 on Route 43 aprchg 900 Kennedy Rd heading South

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.