Current time: Refresh

Agencies » Toronto TTC

Line 2 Bloor-Danforth: Minor delays between Keele and Pape while we deal with an operational problem. Started (Updated )
On Saturday, April 27, there will be no subway service on Line 1 Yonge-University between Davisville and York Mills stations due to planned track work. Shuttle buses will operate. Regular service will resume on Sunday, April 28 at 8 a.m. (Updated )
This weekend, there will be no subway service on Line 2 between Woodbine and Kennedy stations due to track work. Shuttle buses will operate. Regular service will resume by 6 a.m. on Monday, April 22, 2024 See other service alerts. (Updated Apr 16 )

Remove ads by becoming a Premium User

 • : 43-Kennedy at 3223 Kennedy Rd going 43A North to Steeles

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 10 Mins
at . 14:29 behind Vehicle 3201 Load 218%?

2: 13 Mins
at . 7:29 behind Vehicle 3305 Load 30%?

3: 14 Mins
at . 1:12 ahead of Vehicle 3269 Load 13%?

4: 16 Mins
at . 9:12 ahead of Vehicle 3230 Load 20%?

5: 32 - 35 Mins
at . 3:31 ahead of Vehicle 3307 Load 157%?

Vehicle 8915 on Route 43 aprchg Ellesmere Rd North Side on Kennedy Rd heading North

Vehicle 9221 on Route 43 past Kennedy Station Drop-Off Platform heading South

Vehicle 9228 on Route 43 past Landseer Rd South Side on Kennedy Rd heading South

Vehicle 3307 on Route 43 at Bertrand Ave on Kennedy Rd heading South

Vehicle 9239 on Route 43 at Landseer Rd South Side on Kennedy Rd heading South

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.