Current time: Refresh

Agencies » Toronto TTC

Line 2 Bloor-Danforth: Minor delays between Keele and Pape while we deal with an operational problem. Started (Updated )
On Saturday, April 27, there will be no subway service on Line 1 Yonge-University between Davisville and York Mills stations due to planned track work. Shuttle buses will operate. Regular service will resume on Sunday, April 28 at 8 a.m. (Updated )
This weekend, there will be no subway service on Line 2 between Woodbine and Kennedy stations due to track work. Shuttle buses will operate. Regular service will resume by 6 a.m. on Monday, April 22, 2024 See other service alerts. (Updated Apr 16 )

Remove ads by becoming a Premium User

 • : 43-Kennedy at 3015 Kennedy Rd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:44 Mins
at . 6:03 ahead of Vehicle 3303 Load 74%? 43A North to Steeles

2: 13 Mins
at . 3:48 ahead of Vehicle 3192 Load 123%? 43A North to Steeles

3: 37 Mins
at . (Sched. based) 0:00 behind Vehicle 9203 North to Steeles

4: 46 - 47 Mins
at . 1:38 ahead of Vehicle 3250 Load 322%? 43A North to Steeles

5: 56 - 57 Mins
at . 1:38 ahead of Vehicle 3305 Load 100%? 43A North to Steeles

Vehicle 9239 on Route 43 past Landseer Rd South Side on Kennedy Rd heading South

Vehicle 3250 on Route 43 at Bertrand Ave on Kennedy Rd heading South

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.