Current time: Refresh

Agencies » Toronto TTC

This Saturday and Sunday, subway service on Line 2 Bloor-Danforth will not stop at Pape Station due to subway tunnel work related to the new Ontario Line. Bus service will not be affected. (Updated )
On Saturday, April 27, there will be no subway service on Line 1 Yonge-University between Davisville and York Mills stations due to planned track work. Shuttle buses will operate. Regular service will resume on Sunday, April 28 at 8 a.m. (Updated Apr 19 )

Remove ads by becoming a Premium User

 • : 88-South Leaside at St Clair Ave East on Welland Ave

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 Mins
at . 4:06 ahead of Vehicle 8670 Load 129%? 88B West to St Clair Station

2: 18 - 24 Mins
at . 6:35 ahead of Vehicle 8789 Load 79%? 88A West to St Clair Station Last seen 1:06

3: 30 - 36 Mins
at . 6:35 ahead of Vehicle 8692 Load 100%? 88B West to St Clair Station

4: 42 - 48 Mins
at . 6:35 ahead of Vehicle 8672 Load 100%? 88A West to St Clair Station

5: 54 - 1h00 Mins
at . 6:35 ahead of Vehicle 8761 Load 100%? 88B West to St Clair Station

Vehicle 8789 on Route 88 aprchg 75 Thorncliffe Park Dr heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.