Current time: Refresh

Agencies » Boston MBTA

 •  SL1-Logan Airport Terminals - South Station

 
Stops
Vehicles
Schedule
 

Remove ads by becoming a Premium User

Route vehicle history:

Vehicle 1334 3:01 ahead of towards Logan Airport Many Seats Available Occupancy: 40%
at South Station Last seen 1:58

Vehicle 1337 4:24 ahead of towards Logan Airport
aprchg Terminal A

Vehicle 1320 0:25 ahead of towards South Station Few Seats Available Occupancy: 40%
at Terminal E - Arrivals Level

Missing vehicles

Scheduled to be at Silver Line Way going to South Station.

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
SL1, SL2, and SL3 will operate at street level between Silver Line Way and South Station, from 8:45 PM to the end of service on April 6, due to maintenance work. Starts Apr 6 Until Apr 7
More...

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.