Agencies » Boston MBTA

 •  SL3-Chelsea Station - South Station

 
Stops
Vehicles
Schedule
 

Jump to: South

Chelsea
South Station
Courthouse
World Trade Center
Silver Line Way
Airport
Eastern Avenue
Box District
Bellingham Square
Chelsea
South Station
Chelsea
Bellingham Square
Box District
Eastern Avenue
Airport
Congress St at World Trade Center Sta
Silver Line Way
World Trade Center
Courthouse
South Station

Additional Stops:

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL 3 detoured Fri, April 19 from 10 PM through the end of service due to construction. Inbound service will be diverted to the Sumner Tunnel due to construction at the I-90 Exit 135. Starts Apr 19 Until Apr 20

Premium tracking history reports and charts

View Operating Chart (last 3 hours only)

See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.

Route Performance Chart

See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.

View Route Tracking History

See a list of trips for a route or a vehicle.

Message/Alert History

The agency messages in effect during a range of time.

Schedule/Headway Adherence Chart

See the distribution of schedule or headway adherence by stop for a branch.

Passenger Load Chart

See the distribution of each passenger load level by stop for a branch.

Route Delay Map

Map of locations where vehicles are delayed along the route.

Choose Stop for Stop History

See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.

Choose Stops for Link Times

Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.