LINES 158 and 169 detoured due to construction. Started Sep 16 2020 (Updated Dec 11 ) Location: Woodman Ave. between Roscoe Blvd. & Saticoy St.
Line 158
Westbound: Regular route to Woodman Ave. and Sherman Way, R-Sherman Way, L-Coldwater Canyon Ave., L-Roscoe Blvd., R-Woodman Ave. and regular route.
Eastbound: Regular route to Woodman Ave. and Chase St., continue via Woodman Ave., L-Roscoe Blvd., R-Coldwater Canyon Ave., R-Sherman Way, L-Woodman Ave., and regular route.
Line 169
Westbound: Regular route to Saticoy St. and Coldwater Canyon Ave, R-Coldwater Canyon Ave, L-Roscoe Blvd, R-Woodman Ave. and regular route.
Eastbound: Regular route to Woodman Ave. and Chase St., continue via Woodman Ave., L-Roscoe Blvd., R-Cold Water Canyon Ave., L-Saticoy St. and regular route.More...
The following stop is closed until Mon April 1 Monday through Saturday from 8:00 PM to 6:00 AM due to construction: Van Nuys / Blythe (Northbound) Started Until Apr 2 (Updated Mar 27 ) Affected routes:
169
233
761More...