Agencies » Snohomish Community Transit

 •  405-Edmonds P&R - Seattle

Select additonal stop for prediction

No branches have been detected as scheduled, so all branches are listed

 
Stops
Vehicles
Schedule
 
Seattle 2nd AveEdmonds P&R
Edmonds Park at Ride Bay 14th Ave S at S Jackson St
Hwy 99 at 216th St SW4th Ave S at S Washington St
220th St SW at 70th Ave W4th Ave at Cherry St
220th St SW at 66th Ave W4th Ave at Seneca St
Stewart St at 9th Ave4th Ave at Pine St
Stewart St at 7th AveOlive Way at 6th Ave
Stewart St at 4th AveHowell St at 9th Ave
2nd Ave at Stewart StHowell St at Yale Ave
2nd Ave at Seneca St220th St SW at 64th Ave W
2nd Ave at Cherry St220th St SW at 66th Ave W
2nd Ave Ext S at Yesler Way220th St SW at 70th Ave W
Hwy 99 at 220th St SW
Hwy 99 at 216th St SW
Edmonds Park at Ride Bay 1
The following stop is closed: (CT Stop #2349) 2nd Ave Ext S & Yesler Way (to Downtown Seattle) bit.ly/CTReal-TIme Started Jan 11
More...

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.