Starting Sunday, August 30 at 7 a.m. through Tuesday, September 22 at 7 p.m., 26 Avenue S.W. will be closed from 16 - 17A Street S.W. for construction. Route 6 will be detoured.
Inbound buses will travel:
- East on 26 Avenue S.W.
- North on 18 Street S.W.
- East on 25 Avenue S.W.
- North on 17A Street S.W., to regular route
Outbound buses will travel:
- South on 17A Street S.W.
- West on 25 Avenue S.W.
- South on 18 Street S.W.
- West on 26 Avenue S.W. to regular route
The following stops will be temporarily closed:
- NB 17A ST SW @ 26 AV SW (#8765)
- WB 26 AV SW @ 17A ST SW (#8769)
Please use the following temporary stops in lieu of the closed stops:
- NB 17A ST SW @ 25 AV SW (far side)
- WB 26 AV SW @ 18 ST SW (far side)
Starting at 7 a.m. on Friday, September 11, and continuing until 7 a.m. on Sunday, September 13, southbound 17A Street S.W. will be closed at 21 Avenue S.W. Route 6 will have a stop closure.
The following stop will be temporarily closed:
- SB 17A ST SW @ 22 AV SW (#8767)
Please use the following temporary stop in lieu of the closed stop:
- SB 17A ST SW @ 22 AV SW (far side)
Starting Friday, September 11 at 7 a.m. through Thursday, September 17 at 7 p.m., 26 Avenue S.W. between 26 - 29 Street S.W. will be closed for construction. Route 6 will be affected.
The following stops will be temporarily closed:
- EB 26 AV SW@ 29 ST SW (#5320) - Route 6
- EB 26 AV SW @ 26A ST SW (#8783) - Route 6
Please use the following stops in lieu of the closed stops:
- EB 26 AV SW @ 30 ST SW - far side temporary stop
- EB 26 AV SW @ 26 ST SW - far side temporary stop
Starting Monday, May 25 and continuing until further notice, due to a road closure on the corner of 1 Street S.W. @ 10 Avenue, routes 6, 7, 13, 15, 24 and 90 will have stop closures.
The following stops will be temporarily closed:
- NB 1 ST S.W. @ 10 AV S.W. (#7315) - nearside - Routes 6, 24 & 90
- SB 1 ST S.W. @ 10 AV S.W. (#7840) - Routes 7, 13, 15 & 90
Please use the following stop in lieu of the closed stops:
- SB 1 ST S.W. @ 10 AV S.W. - 100m south of closed stop - Routes 7, 13, 15 & 90
Starting at 7 a.m. on Friday, September 11, and continuing until 7 a.m. on Sunday, September 13, southbound 17A Street S.W. will be closed at 21 Avenue S.W. Route 6 will have a stop closure.
The following stop will be temporarily closed:
- SB 17A ST SW @ 22 AV SW (#8767)
Please use the following temporary stop in lieu of the closed stop:
- SB 17A ST SW @ 22 AV SW (far side)
Starting Friday, September 11 at 7 a.m. through Thursday, September 17 at 7 p.m., 26 Avenue S.W. between 26 - 29 Street S.W. will be closed for construction. Route 6 will be affected.
The following stops will be temporarily closed:
- EB 26 AV SW@ 29 ST SW (#5320) - Route 6
- EB 26 AV SW @ 26A ST SW (#8783) - Route 6
Please use the following stops in lieu of the closed stops:
- EB 26 AV SW @ 30 ST SW - far side temporary stop
- EB 26 AV SW @ 26 ST SW - far side temporary stop
- Click on the dots to get a link to the trip path for that trip.
- Zoom with mouse wheel or two figures and drag to scroll.
- Click on the legend to hide or show individual vehicles or "Hide all" or "Show all" below.
- Dot size indicates load, where available.