Agencies » Los Angeles Metro
On Saturday and Sunday, March 14-15, from 8 am to 6 pm, San Pedro Station St Station will be closed, due to maintenance. Buses will provide service to Washington, San Pedro St, and Grand/LATTC stations.
Shown to now
The Grand Ave pedestrian bridge level will be closed from Monday, February 16, through Sunday, May 31, due to construction at the Broad Museum. Alternate stairs and an ADA shuttle are available for travel to and from Grand Avenue.
Shown Mon Feb 16 to now
On Saturday and Sunday, March 14-15, from 8 am to 6 pm, San Pedro Station St Station will be closed, due to maintenance. Buses will provide service to Washington, San Pedro St, and Grand/LATTC stations.
Shown Thu Mar 12 to Fri Mar 13
Trains will run every 20 minutes between APU/Citrus and Union Station due to maintenance. Normal service will run between Union Station and Downtown Long Beach.
Shown to
From Open to 6pm on Saturday, March 21, A Line trains will run every 14 minutes due to maintenance.
Shown to now
On Tuesday, March 17 from 10am-2pm, trains will run every 20 minutes between APU/Citrus and Union Station due to maintenance.
Shown to now
- Click on the dots to get a link to the trip path for that trip.
- Zoom with mouse wheel or two figures and drag to scroll.
- Click on the legend to hide or show individual vehicles or "Hide all" or "Show all" below.
- Dot size indicates load, where available.